The Full Forensic Planning / Delay Analysis for Construction
- 4.2
2.5 hours on-demand video
$
9.99
Brief Introduction
The full 20 hrs delay analysis course for Construction project EOT (Extension of time Claims)Description
The course content
- How are claims prepared
- What are the sections of a typical claim submission
- What the sources of usual project disputes and how it can be avoided
- An explanation of the common terminologies used in claim industry
- The difference between a critical path and longest path
- An overview of the various type of Delay Analysis Techniques
- In depth study of the 5 major techniques applied to a case study.
- Advanced Windows Analysis applications tips and tricks
- How to select the most suitable delay analysis technique
- Practice project to be completed by student and discussed with Instructor.
Requirements
- Requirements
- Planning and Scheduling Knowledge